MONTREAL - Tomagold Corporation reported on drill holes TOM-25-009 and TOM-25-010 at its Berrigan Mine…
Grade Control Drilling At The Moss Main Zone
VANCOUVER – Gold X2 Mining Inc. reported on the ongoing grade control drill program, with nineteen shallow holes targeting the marginal to core shears within the Main Zone at the Moss Gold Project in Northwest Ontario.
Michael Henrichsen, CEO, said, “We are pleased with the latest batch of results that show long continuous broad intervals of gold mineralization that continue to align with our geological model. In addition, higher grade internal intervals within these broad intercepts line up well between drill holes demonstrating continuity and furthers our understanding of the geometry of high grade with the deposit with higher density drilling. This information is crucial as we look to define higher grade zones that could positively impact the economic performance of the deposit moving forward.”
Related Posts
TORONTO - Hercules Metals Corp. reported on its ongoing 2025 drilling campaign on the Leviathan…
VANCOUVER - Excalibur Metals Corp. reported on the recently completed ground work at the Bellehelen…