VANCOUVER - Atomic Minerals Corporation reported submission of drill permits at its 1,516.5 acre (614 hectare)…
La Verde Discovery Has Six Drillholes That Have Been Completed
PERTH, AUS – Hot Chili Limited reported on its La Verde copper–gold (Cu-Au) discovery, located roughly 30 km south of the Costa Fuego Copper-Gold (Cu-Au) Project planned central processing hub in Chile’s coastal Atacama region.
Phase two diamond drilling began on 22 September 2025 with one rig operating on a double-shift basis, with six drillholes now complete. This program aims to extend the initial +0.2% Cu discovery footprint of 1,000 m by 750 m by 400 m depth, while also extending the +0.3 g/t Au distribution identified during Phase one.
Initial assays from twin diamond drillhole DKD032 have exceeded expectations, delivering a standout result of 529 m grading 0.41% Cu and 0.21 g/t Au from 41m to end of hole. Importantly the new drill result: 1) Confirms convergence of higher-grade Cu-Au mineralisation centres at depth. 2) Significantly expands both vertical and lateral extent of the northeastern higher-grade mineralisation centre, characterised by a high gold-to-copper ratio. 3) Materially extends the original 308 m intercept (RC hole DKP002) by a further 221 m to end of hole (570 m).
These latest results have significant implications for the growth of Hot Chili’s Costa Fuego Mineral Resource base and scale of planned future operations.
Related Posts
VANCOUVER - Stillwater Critical Minerals Corp. reported on the resource expansion drill campaign at the…
GRASS VALLEY, CA - Rise Gold Corp. has entered into a strategic development partnership with…