MONTREAL - Tomagold Corporation reported on drill holes TOM-25-009 and TOM-25-010 at its Berrigan Mine…
Milestones Achieved At Fremont Gold Project
VANCOUVER – Lode Gold Resources Inc. reported major milestones achieved during 2025, as well as the key catalysts expected for 2026 at its Fremont Gold Project, located in Mariposa, California, along the prolific 190 km Mother Lode Gold Belt. Fremont is a historic high-grade past-producing mine that averaged 10.7 g/t Au prior to its suspension in 1942 under War Production Order L-208. Today, the project represents one of the most continuous and laterally extensive underground gold systems in the belt. Lode Gold controls 3,351 acres of patented land, with 100% ownership of surface and mineral rights with road access, power, water, rail proximity and an airport 1.5 hours away.
Related Posts
TORONTO - Hercules Metals Corp. reported on its ongoing 2025 drilling campaign on the Leviathan…
VANCOUVER - Excalibur Metals Corp. reported on the recently completed ground work at the Bellehelen…