VANCOUVER - Atomic Minerals Corporation reported submission of drill permits at its 1,516.5 acre (614 hectare)…
Phase Two Program On The Silver Cord Property
VANCOUVER – King Global Ventures Inc. has commenced drilling on a Phase (2) diamond drilling program at its Silver Cord Project located 68 miles north of Phoenix AZ. The Phase (2) program will consist of 6 holes from 2 drill pads for up to 6,000 feet of diamond drilling.
The Phase (2) drill program at the Silver Cord Project will expand on the Phase 1 program at the Silver Cord Project. The Phase 1 program successfully intersected multiple polymetallic intervals and confirmed the presence of a polyphase Ag-Pb-Zn-Sb vein system hosted with the Spud Mountain stratigraphy. The program also provided important insight into the nature of the IP anomaly beneath Silver Cord.
The Highlight intercept from Phase 1, included 9 feet (2.7 metres) at 21.8 ounces (619 grams) per tonne Silver, 1.0 g/t Gold, 0.6% Lead, 1.05% Zinc and 375 g/t Antimony.
Robert Dzisiak, CEO, said, “We are very excited about our Phase 2 drill program on the Silver Cord property and the success of the initial drilling. Our full drilling review indicates that there are 2 different polymetallic intervals that warrant further drilling to extend strike length and prove continuity of grade.”
Related Posts
VANCOUVER - Stillwater Critical Minerals Corp. reported on the resource expansion drill campaign at the…
GRASS VALLEY, CA - Rise Gold Corp. has entered into a strategic development partnership with…